Skip to content
Royalty Clerk

Texas oil lease

Producing

BRYAN COOLING LAKE UNIT

Bryan Cooling Lake Unit is an oil lease in Brazos County, Texas, operated by Wildfire Energy Operating LLC in the Giddings (Austin Chalk-3) field.

1 well

5,549bbl oil, last 12 months+32% vs prior year
RRC lease
03-22279

Is your check right?

Check my statement

Where it sits

This county

Brazos CountyBrazosWalkerFallsMadisonBurlesonLeeRobertsonGrimesMilamBrazos County
Brazos County
Gas, last 12 months
4,150 mcf
Oil in Jun 2026
550 bbl

Production by month

Oil output rose 32% over the last 12 months

Jul 2026 was not reported.

  • Oil (bars)
  • Gas (line)
  • Last 12 months
Oil output rose 32% over the last 12 monthsMonthly oil production and gas for BRYAN COOLING LAKE UNIT, Aug 2023 to Jul 2026. Oil output rose 32% over the last 12 months. 5,219 bbl in the 12 months through Jul 2026, against 3,965 bbl in the 12 months before.Last 12 months: 5,219 bblbbl per monthmcf per month002502005004007506001,000800Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Oil output rose 32% over the last 12 monthsMonthly oil production and gas for BRYAN COOLING LAKE UNIT, Aug 2023 to Jul 2026. Oil output rose 32% over the last 12 months. 5,219 bbl in the 12 months through Jul 2026, against 3,965 bbl in the 12 months before.Last 12 monthsbbl per monthmcf per month002502005004007506001,000800Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

93% of the gas went to a transmission line in the last 12 months

  • Transmission line (2)
  • Lease fuel (1)
93% of the gas went to a transmission line in the last 12 monthsShare of BRYAN COOLING LAKE UNIT gas by disposition code each month, Aug 2023 to Jul 2026. 93% of the gas went to a transmission line in the last 12 months.Share of the lease’s gas by disposition code, per month0%50%100%Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
93% of the gas went to a transmission line in the last 12 monthsShare of BRYAN COOLING LAKE UNIT gas by disposition code each month, Aug 2023 to Jul 2026. 93% of the gas went to a transmission line in the last 12 months.Share of gas by disposition code0%50%100%Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Transmission line (2)

    93% · 3,860 mcf

  • Lease fuel (1)

    7.0% · 290 mcf

Who has run this lease

The operator changed once, most recently in Mar 2023

Operators of this lease over timeChesapeake Operating, L.L.C., Jan 2020 to Feb 2023; Wildfire Energy Operating LLC, Mar 2023 to Jun 20262020202120222023202420252026Changed Mar 2023Chesapeake Operating, L.L.C.Jan 2020 to Feb 2023Wildfire Energy Operating LLCMar 2023 to now
Operators of this lease over timeChesapeake Operating, L.L.C., Jan 2020 to Feb 2023; Wildfire Energy Operating LLC, Mar 2023 to Jun 20262020202120222023202420252026Changed Mar 2023Chesapeake Operating, L.L.C.Jan 2020 to Feb 2023Wildfire Energy Operating LLCMar 2023 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on BRYAN COOLING LAKE UNIT
API numberWell no.Status
42-041-317371Active

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Energy Trans Crude Marketing LLCOilGathers51May 26, 2023–
Shell Trading (Us) CompanyOilGathers49May 26, 2023–
Energy Transfer CompanyCasinghead gasBuys100Mar 1, 2021–
Energy Transfer CompanyCasinghead gasGathers100Jul 7, 2016–
Chesapeake Energy Mktg, L.l.c.OilGathers100Mar 1, 2021May 26, 2023
Etc Texas P/L, LTDCasinghead gasBuys100Jul 7, 2016Mar 1, 2021
Eastex Crude CompanyOilGathers100Jul 1, 2003Mar 1, 2021

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

542.56 acres on the newest permit

  • Good to know

    A pooling certificate (P-12) was filed

    Your tract may share its production with neighbors in a pooled unit. The unit acres the operator uses to divide production can differ from the acreage on one permit.

Check your decimal on this lease
Permits for Bryan Cooling Lake Unit
API numberWell no.Acreson the permit
42-041-317371542.56

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for BRYAN COOLING LAKE UNIT
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026No report–––––$80.46$2.89
Jun 2026Wildfire Energy5505294273970$84.81$3.15
May 2026Wildfire Energy6257204944590$102.13$2.94
Apr 2026Wildfire Energy6115452982770$100.32$2.77
Mar 2026Wildfire Energy5397243473230$91.38$3.04
Feb 2026Wildfire Energy9198974293990$64.51$3.62
Jan 2026Wildfire Energy7707123983700$60.04$7.72
Dec 2025Wildfire Energy2561781741620$57.97$4.26
Nov 2025Wildfire Energy1321821731610$60.06$3.79
Oct 2025Wildfire Energy3113394324020$60.89$3.19
Sep 2025Wildfire Energy1801841321230$63.96$2.97
Aug 2025Wildfire Energy3263593413170$64.86$2.91
Jul 2025Wildfire Energy3301775054700$68.39$3.20
Jun 2025Wildfire Energy3283624954600$68.17$3.02
May 2025Wildfire Energy3423605004650$62.17$3.12
Apr 2025Wildfire Energy3383574614290$63.54$3.42
Mar 2025Wildfire Energy3193534363940$68.24$4.12
Feb 2025Wildfire Energy1351794193790$71.53$4.19
Jan 2025Wildfire Energy5113614434030$75.74$4.13
Dec 2024Wildfire Energy2543613603270$70.12$3.01
Nov 2024Wildfire Energy3303575164700$69.95$2.12
Oct 2024Wildfire Energy3453365454940$71.99$2.20
Sep 2024Wildfire Energy3853575294770$70.24$2.28
Aug 2024Wildfire Energy3483685755200$76.68$1.99
Jul 2024Wildfire Energy3173645274790$81.80$2.07
Jun 2024Wildfire Energy2613604734290$79.77$2.54
May 2024Wildfire Energy3271815384830$80.02$2.12
Apr 2024Wildfire Energy3363494994460$85.35$1.60
Mar 2024Wildfire Energy4023605534980$81.28$1.49
Feb 2024Wildfire Energy3653715174650$77.25$1.72
Jan 2024Wildfire Energy3833305454860$74.15$3.18
Dec 2023Wildfire Energy4293815725180$71.90$2.52
Nov 2023Wildfire Energy2061852722460$77.69$2.71
Oct 2023Wildfire Energy1461901961770$85.64$2.98
Sep 2023Wildfire Energy2041823052760$89.43$2.64
Aug 2023Wildfire Energy4235375094630$81.39$2.58

No report filed

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Wildfire Energy Operating LLC in Brazos County

All Wildfire Energy Operating LLC leases →

Leases within 10 km

Drilling permits within 10 km