Skip to content
Royalty Clerk

Texas gas well

Producing

ETHEREDGE A

Etheredge A is a gas well in Hemphill County, Texas, operated by Presidio Petroleum LLC in the Hemphill (Granite Wash.) field.

1 well

70,190mcf gas, last 12 months−32% vs prior year
RRC lease
10-277716

Is your check right?

Check my statement

Where it sits

This county

Hemphill CountyHemphillLipscombRobertsOchiltreeHemphill County
Hemphill County
Oil, last 12 months
718 bbl
Gas in Jul 2026
0 mcf

Checks stopped on this lease?

  • Operator

    Operator changed: Presidio Petroleum LLC took over from Eqv Operating LLC in Mar 2026.

  • Buyer

    Buyer changed: SUPERIOR MIDSTREAM TEXAS, LLC replaced SUPERIOR PIPELINE COMPANY,L.L.C. as the buyer of this lease's gas from gas wells on Apr 14, 2026.

  • Sales

    Sales over the last 3 months fell to 24% of the 9 months before.

SourceRailroad Commission production, P-5 and P-4 records, data through Jul 2026.

See why checks stop on this lease

Production by month

Gas output fell 32% over the last 12 months

  • Gas (bars)
  • Oil (line)
  • Last 12 months
Gas output fell 32% over the last 12 monthsMonthly gas production and oil for ETHEREDGE A, Aug 2023 to Jul 2026. Gas output fell 32% over the last 12 months. 70,190 mcf in the 12 months through Jul 2026, against 103,107 mcf in the 12 months before.Last 12 months: 70,190 mcfmcf per monthbbl per month002,500505,0001007,50015010k200Oct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Gas output fell 32% over the last 12 monthsMonthly gas production and oil for ETHEREDGE A, Aug 2023 to Jul 2026. Gas output fell 32% over the last 12 months. 70,190 mcf in the 12 months through Jul 2026, against 103,107 mcf in the 12 months before.Last 12 monthsmcf per monthbbl per month002,500505,0001007,50015010k200Jan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

Where the gas went

Since May 2026 the lease's gas goes to a transmission line instead of a processing plant

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
Since May 2026 the lease's gas goes to a transmission line instead of a processing plantShare of ETHEREDGE A gas by disposition code each month, Aug 2023 to Jul 2026. Since May 2026 the lease's gas goes to a transmission line instead of a processing plant.Share of the lease’s gas by disposition code, per month0%50%100%May 2026: plant to lineOct 23Jan 24AprJulOctJan 25AprJulOctJan 26AprJul
Since May 2026 the lease's gas goes to a transmission line instead of a processing plantShare of ETHEREDGE A gas by disposition code each month, Aug 2023 to Jul 2026. Since May 2026 the lease's gas goes to a transmission line instead of a processing plant.Share of gas by disposition code0%50%100%May 26: plant to lineJan 24JulJan 25JulJan 26Jul

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

  • Processing plant (3)

    72% · 56,842 mcf

  • Lease fuel (1)

    22% · 17,105 mcf

  • Transmission line (2)

    5.8% · 4,547 mcf

Who has run this lease

The operator changed 2 times, most recently in Mar 2026

Operators of this lease over timeUnit Petroleum Company, Jan 2020 to Sep 2023; Eqv Operating LLC, Oct 2023 to Feb 2026; Presidio Petroleum LLC, Mar 2026 to Jul 20262020202120222023202420252026Changed Oct 2023Changed Mar 2026Unit Petroleum CompanyJan 2020 to Sep 2023Eqv Operating LLCOct 2023 to Feb 2026Presidio Petroleum LLCMar 2026 to now
Operators of this lease over timeUnit Petroleum Company, Jan 2020 to Sep 2023; Eqv Operating LLC, Oct 2023 to Feb 2026; Presidio Petroleum LLC, Mar 2026 to Jul 20262020202120222023202420252026Changed Oct 2023Changed Mar 2026Unit Petroleum CompanyJan 2020 to Sep 2023Eqv Operating LLCOct 2023 to Feb 2026Presidio Petroleum LLCMar 2026 to now

SourceTexas Railroad Commission Production Data Query, through Jul 2026.

1 well on this lease

Wells on ETHEREDGE A
API numberWell no.Status
42-211-350974046HShut-in

SourceTexas Railroad Commission Wellbore Query.

Buyers and gatherers

Companies named on the Form P-4, by product
CompanyProductRoleShare%FromUntil
Mission Petroleum Carriers, Inc.CondensateGathers90Apr 14, 2026–
Cp Energy, L.l.c.CondensateGathers10Apr 14, 2026–
Superior Midstream Texas, LLCGas-well gasBuys100Apr 14, 2026–
Superior Midstream Texas, LLCGas-well gasGathers100Apr 14, 2026–
Mission Petroleum Carriers, Inc.CondensateGathers100Sep 1, 2015Apr 14, 2026
Superior Pipeline Company,l.l.c.Gas-well gasGathers100Dec 23, 2014Apr 14, 2026
Superior Pipeline Company,l.l.c.Gas-well gasBuys100Dec 23, 2014Apr 14, 2026

SourceRailroad Commission Form P-4 file, Sep 24, 2026 (source).

640 acres on the newest permit

Permits for Etheredge A
API numberWell no.Acreson the permit
42-211-350974046H640

SourceRailroad Commission drilling permits, Oct 3, 2026 (source 1, source 2).

Estimate your royalty

36 months, newest first

Ledger for ETHEREDGE A
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3FlaredmcfWTI$/bblHenry Hub$/MMBtu
Jul 2026Presidio Petroleum30000$80.46$2.89
Jun 2026Presidio Petroleum1502,5472,5470$84.81$3.15
May 2026Presidio Petroleum001,4711,4710$102.13$2.94
Apr 2026Presidio Petroleum9507,8316,2580$100.32$2.77
Mar 2026Presidio Petroleum413922,6315290$91.38$3.04
Feb 2026Eqv Operating8407,6226,0160$64.51$3.62
Jan 2026Eqv Operating7408,3896,3630$60.04$7.72
Dec 2025Eqv Operating3107,5415,9390$57.97$4.26
Nov 2025Eqv Operating1083927,8746,3030$60.06$3.79
Oct 2025Eqv Operating971888,4596,6090$60.89$3.19
Sep 2025Eqv Operating6407,6076,0190$63.96$2.97
Aug 2025Eqv Operating1061908,2186,6230$64.86$2.91
Jul 2025Eqv Operating11108,3046,7120$68.39$3.20
Jun 2025Eqv Operating1051987,9596,4240$68.17$3.02
May 2025Eqv Operating963278,5306,9300$62.17$3.12
Apr 2025Eqv Operating1351938,2476,5600$63.54$3.42
Mar 2025Eqv Operating9808,6196,8350$68.24$4.12
Feb 2025Eqv Operating661918,8125,9490$71.53$4.19
Jan 2025Eqv Operating7209,0777,2210$75.74$4.13
Dec 2024Eqv Operating9209,0946,2620$70.12$3.01
Nov 2024Eqv Operating1181868,7716,6410$69.95$2.12
Oct 2024Eqv Operating8508,1006,2620$71.99$2.20
Sep 2024Eqv Operating7908,9916,9880$70.24$2.28
Aug 2024Eqv Operating781978,6036,6930$76.68$1.99
Jul 2024Eqv Operating8909,1837,1620$81.80$2.07
Jun 2024Eqv Operating9407,9026,9380$79.77$2.54
May 2024Eqv Operating1151978,9207,2280$80.02$2.12
Apr 2024Eqv Operating10708,6757,1660$85.35$1.60
Mar 2024Eqv Operating12009,3909,3900$81.28$1.49
Feb 2024Eqv Operating1263848,5166,7540$77.25$1.72
Jan 2024Eqv Operating7609,5689,5680$74.15$3.18
Dec 2023Eqv Operating11809,2969,2960$71.90$2.52
Nov 2023Eqv Operating1071929,1319,1310$77.69$2.71
Oct 2023Eqv Operating9309,6379,6370$85.64$2.98
Sep 2023Unit Petroleum9509,5409,5400$89.43$2.64
Aug 2023Unit Petroleum791839,7679,7670$81.39$2.58

SourceTexas Railroad Commission Production Data Query, through Jul 2026. Prices: EIA, through Aug 2026. Updated Oct 2, 2026.

How to check your stub against this lease Checks stopped on this lease? See the likely reasons

Do your checks match this lease?

Nearby

Presidio Petroleum LLC in Hemphill County

All Presidio Petroleum LLC leases →

Hemphill (Granite Wash.) field

All leases in this field →

Leases within 10 km

New drilling permits in Hemphill County

Newest in the county: this lease has no coordinates.