Skip to content

Texas oil lease · RRC district 08 · Lease 64402

Producing

GEORGE C

George C is an oil lease in Midland County, Texas, operated by Apache Corporation in the Spraberry (Trend Area) field. The Railroad Commission shows 421,192 bbl of oil in the 10 months reported, Oct 2025 through Jul 2026.

Oil lease dossier · 4 wells

421,192bbl oil, since Oct 2025
RRC lease
08-64402

Own a share of this lease?

Is your check right?

Upload a check stub or a phone photo. We compare every month with the state numbers on this page.

Check my statement

Free. No account needed. Two to four pages.

Where it sits

This county

Midland CountyMidlandMartinAndrewsGlasscockHowardEctorMidland County
Midland County · RRC district 08Open Midland County →
Gas, since Oct 2025
575,107 mcf
Oil in Jul 2026
31,819 bbl
Reporting to the state
since Oct 2025
Wells
4

Production

Month by month, from the state record

What the Railroad Commission says this oil lease produced. Oil is in barrels (bbl). Gas is in thousand cubic feet (mcf).

Oil output rose 82% since Oct 2025

Monthly average of 40,547 bbl in the latest 3 months, against 22,245 bbl in the first 3.

  • Oil (bars, left axis)
  • Gas (line, right axis)
Oil output rose 82% since Oct 2025Monthly oil production and gas for GEORGE C, Oct 2025 to Jul 2026. Oil output rose 82% since Oct 2025. Monthly average of 40,547 bbl in the latest 3 months, against 22,245 bbl in the first 3.bbl per monthmcf per month0020k25k40k50k60k75k80k100k100k125kOct 25Jan 26AprJul
Oil output rose 82% since Oct 2025Monthly oil production and gas for GEORGE C, Oct 2025 to Jul 2026. Oil output rose 82% since Oct 2025. Monthly average of 40,547 bbl in the latest 3 months, against 22,245 bbl in the first 3.bbl per monthmcf per month0020k25k40k50k60k75k80k100k100k125kJan 26Jul

SourceTexas Railroad Commission Production Data Query, oil lease 64402, district 08. Reported through Jul 2026. The state revises recent months.

Gas disposition

Where the gas went

Every month the operator tells the state where each mcf of gas went, using a code. The code decides how your gas is paid.

93% of the gas went to a transmission line in the 10 months reported

Flaring peaked at 7.1% of the gas in Apr 2026.

  • Processing plant (3)
  • Transmission line (2)
  • Lease fuel (1)
  • Flared (4)
93% of the gas went to a transmission line in the 10 months reportedShare of GEORGE C gas by disposition code each month, Oct 2025 to Jul 2026. 93% of the gas went to a transmission line in the 10 months reported. Flaring peaked at 7.1% of the gas in Apr 2026.Share of the lease’s gas by disposition code, per month0%50%100%Flared 7.1%Oct 25Jan 26AprJul
93% of the gas went to a transmission line in the 10 months reportedShare of GEORGE C gas by disposition code each month, Oct 2025 to Jul 2026. 93% of the gas went to a transmission line in the 10 months reported. Flaring peaked at 7.1% of the gas in Apr 2026.Share of gas by disposition code0%50%100%Flared 7.1%Jan 26Jul

SourceTexas Railroad Commission Production Data Query, gas disposition by code, lease 64402, district 08. Reported through Jul 2026.

Processing plant (3)

Sent to a gas plant that pulls out natural gas liquids. Your statement should show plant products, and may show processing fees.

Transmission line (2)

Sold straight into a pipeline without processing. Processing fees on your statement would be worth asking about.

Lease fuel (1)

Burned to run equipment on the lease. Not sold, so it pays no royalty. A few percent is normal.

Flared (4)

Burned off or vented, not sold. It pays no royalty. More than 3% in a month is worth watching.

Over the 10 months reported, 3.0% of the gas was flared. 4 months went above 3%, which we mark in the ledger below.

Operator history

Who has run this lease

The operator runs the wells and pays your royalty. When the operator changes, payments often slip for a month or two.

Apache Corporation has reported this lease for the whole period

No change of operator in the months we hold.

Operators of this lease over timeApache Corporation, Oct 2025 to Jul 20262026Apache CorporationOct 2025 to nowthrough Jul 2026
Operators of this lease over timeApache Corporation, Oct 2025 to Jul 20262026Apache CorporationOct 2025 to nowthrough Jul 2026

SourceTexas Railroad Commission Production Data Query, operator by month. Reported through Jul 2026.

Wells

4 wells on this lease

Every well the Railroad Commission links to oil lease 64402 in district 08. The API number is the state’s ID for a well.
Wells on GEORGE C
API numberWell no.Status
42-329-475725HSActive
42-329-475738HSActive
42-329-4757411HJActive
42-329-4757512HSActive

SourceTexas Railroad Commission Wellbore Query, district 08, lease 64402.

Estimator

Estimate your royalty for this lease

A rough check before you look at a statement: the state volumes times your decimal, priced at WTI and Henry Hub.

Estimator

What could your check be?

Your decimal interest is the small number on your division order that says what share of the whole lease (8/8ths) is yours. Type it in and we apply it to what the state says GEORGE C sold each month.

For example 0.00097656, or a fraction like 1/1024.

Dollars per barrel. Your statements show the gap your operator uses. Leave 0 to price oil at WTI.

Your estimate appears here

Enter your decimal to see an estimated royalty for each of the last 10 months this lease reported. Nothing you type leaves your browser.

An estimate, not your check

It ignores gathering and processing fees, taxes, plant products and the price your operator actually gets, so your statement will differ. Use it as a ceiling to compare against. Regional gas prices are often below Henry Hub.

Ledger

10 months, newest first

Compare these numbers with your statements. Your share of a month is the “Oil sold” volume times your decimal. Scroll sideways on a phone.
Monthly production, disposition and prices for GEORGE C
MonthOil producedbblOil soldbblGas producedmcfGas soldmcf, codes 2+3Flaredmcf, code 4WTI$ per bblHenry Hub$ per MMBtu
Jul 2026Apache Corporation31,81931,813106,891105,29221$80.46$2.89
Jun 2026Apache Corporation37,65737,699108,996103,6353,862$84.81$3.15
May 2026Apache Corporation52,16452,24988,75785,6661,408$102.13$2.94
Apr 2026Apache Corporation57,84357,96951,50946,2343,654$100.32$2.77
Mar 2026Apache Corporation82,64682,68357,93954,4981,735$91.38$3.04
Feb 2026Apache Corporation56,56156,59952,13047,9233,471$64.51$3.62
Jan 2026Apache Corporation35,76635,78047,10345,2191,884$60.04$7.72
Dec 2025Apache Corporation44,90544,72044,98144,029952$57.97$4.26
Nov 2025Apache Corporation19,69219,52914,15013,953197$60.06$3.79
Oct 2025Apache Corporation2,1392,1022,6512,63813$60.89$3.19

No report filed More than 3% of gas flared

SourceVolumes: Texas Railroad Commission Production Data Query, reported through Jul 2026. Prices: EIA WTI Cushing spot and Henry Hub spot, monthly, through Aug 2026. “Gas sold” is gas sent to a transmission line (code 2) or a plant (code 3).

Check your statements

Do your checks match this lease?

Upload your statements for GEORGE C. We compare volumes, prices, deductions and timing with the state record and give you the exact question to ask Apache Corporation.

  • A month that was never paid
  • Your share of the barrels and mcf
  • The price against WTI and Henry Hub
  • Fees taken on gas
  • Late payment interest

Around this lease

Walk the neighborhood

Everything on this page connects to the operator, field and county records. Start from any of them.

Apache Corporation in Midland County

All Apache Corporation leases →

Spraberry (Trend Area) field

All leases in this field →

New drilling permits in Midland County

We do not have coordinates for this lease, so these are the newest permits in its county.

How to read this page

Questions owners ask

What is a decimal interest?

It is your share of the whole lease, written as a decimal. A 1/4 royalty on 5 net acres in a 1,280-acre unit is 1/4 × 5 ÷ 1,280 = 0.00097656. Your division order states yours.

How do I use this page to check a royalty check?

Take the “Oil sold” volume for the month the check covers and multiply it by your decimal. The answer should match the barrels on your statement. If it does not, upload the statement and we will show where the two differ.

Why is the newest month Jul 2026?

The Railroad Commission publishes production two to three months after the fact and revises recent months. We re-pull the latest three months on every update.

Does this page show what my check should be?

No. It shows what the state recorded. Prices, fees and taxes depend on your lease and on what your operator gets for the oil and gas. The estimator gives a ceiling to compare against.

Sources and method

Where these numbers come from

  • Production and disposition by month: Texas Railroad Commission Production Data Query, oil lease 64402, district 08, reported through Jul 2026.
  • Wells: Texas Railroad Commission Wellbore Query.
  • Prices: U.S. Energy Information Administration, WTI Cushing spot and Henry Hub spot, monthly.
  • Page updated Sep 28, 2026.

We show the state’s numbers as filed. Where the state has no report for a month, we say so instead of guessing.